Operation and Stacking

Operation

  1. Gently slide out 1st panel from stack bundle into main track (Fig. 1).
  2. Gently push panel to far end opposite to stack (Fig. 2).
  3. Insert rod situated on the side of the bottom rail into the foot bolt
  4. Repeat steps 1 to 3 with all the other panels
  5. When all the panels are in place and all the rods inserted, close the access panel to align it it with the other panles (Fig. 4).

Stacking

Individual panel stacking can be anywhere you want, whether it be far away from the main track or in a pocket. Paired panel stacking is done at either end of the main track.

Stack depth and width demensions are based on a flat stack. Angled stacks required additional space. Contact your Corflex Distributor for angled stack requirements.

Stacks shown are these are those most commonly used. Stacks may be modified to fit job site needs

Overlapped Opening

Stack Depth:
76 mm (3") per panel

Stack Width:
Panel width + 4" (101 mm) finger clearance

Wall to wall opening without pivot panel H Stack

Stack Depth:
76 mm (3") per panel

Stack Width:
Panel width + 4" (101 mm) finger clearance

Access panel closure

Stack Depth:
76 mm (3") per panel + 101 mm (4") for Hinged Closure Panel Handle

Stack Width:
Panel width + 4" (101 mm) finger clearance

Caution

Body space is needed to access the panels and move them into position. Be certain to consult your Corflex representative before constructing walls in pocket/stack areas. This is important for all configurations.

Glass panels are easily moved to storage stack area when not needed in the opening